Lorem ipsum dolor sit amet, consectetur adipiscing elit. Aenean eget tempor diam. Praesent mollis semper augue, vel vehicula metus ullamcorper in. Maecenas congue nulla id lorem ultricies, id euismod augue sagittis. Suspendisse tempor rhoncus egestas. Sed ut eleifend odio. Cras rutrum sagittis commodo. Etiam eu erat sem. Morbi fermentum est non elit lacinia faucibus.

Etiam vehicula ornare faucibus. Praesent eu nibh purus. Fusce felis quam, volutpat in vulputate in, efficitur tristique augue. Duis felis ipsum, scelerisque a convallis aliquam, lobortis nec purus. Suspendisse enim urna, viverra at enim in, pellentesque fringilla libero. Donec tincidunt nulla sit amet lectus aliquam, vel imperdiet purus pellentesque. Sed tempor mi id nisi bibendum, non pellentesque risus accumsan. Sed sed purus ut mauris consequat egestas. Suspendisse vestibulum semper felis ac efficitur. Suspendisse aliquet, urna sed mattis vulputate, odio nunc tempor metus, sed efficitur justo mauris quis enim. Proin luctus, diam quis iaculis porttitor, nibh lectus luctus risus, nec blandit ex massa quis est. Ut quis interdum risus, quis euismod libero. Aenean commodo elit nibh, ac consequat sem luctus in. Sed ac orci tempus, molestie arcu in, sagittis felis. Integer lacinia urna eget justo venenatis hendrerit.

0 Appointment

To establish the certification approach, process and programme.

Etude provide initial information pack outlining process, evidence requirements and what to expect on programme.

1 Design review

To ensure the design is capable of meeting the Passivhaus standard at planning / pre-tender stage, and agree key assumptions.

i. Passivhaus designer sends Etude the PHPP calculation and all supporting evidence available for key stages.

We try to carry out at least one thorough design review before construction tender, for complex projects we would do another review based on planning information.

ii. Etude review the PHPP calculation and design evidence, we provide detailed feedback to the team on thermal performance. Any outstanding design evidence is highlighted.

2 Construction review

To ensure the proposed construction is on track to meet the Passivhaus standard.

i. Client confirms contractor appointment and programme.

ii. Passivhaus designer updates calculations based on contractor design and sends Etude the updated PHPP calculation and all detailed design evidence.

This is typically when the window and door procurement, and the mechanical services design have been finalised.

iii. Etude carry out quality assurance checks for the PHPP calculation and detailed design evidence, certification assessment on finalised information such as window product information.

iv. Etude provide feedback and confirm outstanding evidence required.

3 Final review

To ensure the completed building meets the Passivhaus standard.

i. Passivhaus designer sends Etude the final PHPP calculation with all supporting construction evidence and any updated design information.

ii. Contractor submits final air test and ventilation commissioning reports

iii. Etude complete final review including generating a separate certification PHPP.

Etude submit project to the Passivhaus Institute in Germany for registering and receiving project codes.

4 Certification

To recognise the performance standard achieved by the building.

i. Etude issue Passivhaus certificate and building plaque/s to the client

ii. Project added to the Passivhaus database