What £185m can learn from Passivhaus

Passivhaus design at scale
We were Passivhaus designers on the University of Oxford Stephen Schwarzman Centre for the Humanities, a £185m building with a concert hall, 900 rooms and seven libraries. Working on the building was a fantastic experience and I learnt a lot about collaboration and design for offsite construction, working with over 20 other consultants and specialists throughout the project.
After being a bit overwhelmed by the scale and pace of the project, I soon realised that we were an important connection between Architect, construction and building services. My experience with Passivhaus and the clear principles it brings helped to shape the project right from the beginning. Here are some of the key takeaways to help future projects.
Bespoke consultant guides to empower others
Passivhaus principles — continuous insulation, airtightness, and considered glazing and building services — are simple but easy to overlook. We created tailored briefing sheets for each consultant so they understood what mattered for energy performance. Clear communication made it easier for the team to integrate these ideas early.
On such a large project one of the unexpected challenges was to work out who the right person to talk to was. Simply understanding all the different roles, and being visible as a point of contact, helped incorporate our energy efficiency and net zero carbon principles. Passivhaus provided a useful ‘brand’ that meant energy efficiency was a known priority for the project. It was hard to catch everything, but once our role as the ‘energy people’ and Passivhaus designers was understood I found that the team would contact us with questions about parts of the design as they came up.
Bringing construction and buildability into early design
Large BIM projects can become overly complex. Passivhaus focuses on the thermal line and airtightness strategy, which helped us simplify details and avoid problems later. Early coordination between structure and insulation was critical, especially at tricky areas like basements and terraces.

Offsite construction and 3D BIM junction reviews
The Humanities building was designed in a coordinated BIM model from the beginning, but this went to the next level once an offsite precast concrete construction system was selected. Main contractor Laing O’Rourke work on the motto of ‘build it twice’, once digitally as a practice run, then in real life. The factory manufacture began before the site was fully set up in Oxford, therefore a lot of decisions were made early, and it was very difficult to change anything later.
Reviewing details in 3D helped us spot issues that might have been missed in 2D drawings. However even with advanced software, simple sketches and markups were often the fastest way to communicate. A lot of the design was still completed with pdf markups and screenshares. Sketches on paper held up to the camera, or crude coloured drawings reminiscent of Microsoft Paint, anything to get the message across!
Setting Up Quality Assurance and Record Keeping
Passivhaus demands high construction quality. We worked with the contractor to add checks for insulation and airtightness into their existing QA process. We created bespoke forms in Trimble Fieldview to make sure the right checks for Passivhaus and insulation quality were included.
The forms were also used to document the build for record keeping, Part L photographic record, and Passivhaus certification. A bespoke form for each construction captured every stage, for example for the external precast concrete walls a photo of each of these stages was taken for each wall section:
- Uninsulated precast concrete showing window bracketry
- Window airtightness and waterproofing
- Precast support brackets and thermal breaks
- First layer insulation and fixings
- Second layer insulation and fixings
- Air and vapour control layer taped connections.

Designing for Minimum Ventilation and Peak Demand
The building serves many purposes—study, teaching, offices, and concerts—so the air required from ventilation varies. Passivhaus teaches us that managing air flow into the building is crucial to delivering low energy and net zero carbon buildings.
We worked with the client designer Max Fordham, and then the Laing O’Rourke in house MEP team Crownhouse to design a demand ventilation system that could turn down to meet a low occupancy. It was optimised for air quality, low fan power and maximum heat recovery. One of the biggest challenges was achieving a balanced air flow for each air handling unit across many different operation modes.
Learning from the Building in Use
Passivhaus is just the start – the Stephen Schwarzmann Centre for the Humanities achieved Passivhaus certification in December 2025 – but what happens next is even more important. We helped the client communicate the different purposes of the building metering to the control engineers, to check the building is achieving the energy and carbon savings expected. This structure will allow monitoring, optimisation and diagnosis of any problems. Again Passivhaus brings a focus on overarching simple principles for a discipline that is very good at the detail, but can sometimes lose the purpose.
The next step will be to monitor the building performance and building user experience to refine operation, comparing the operating data to our calculations during design. Hopefully we can demonstrate a truly exceptional low carbon building, delivering fantastic facilities at a low operating cost for the University.