Mulberry Academy – London secondary school

Working closely with the designer and contractor to provide Passivhaus certification assessment, consultancy input and site quality benchmark site visits for this school. It is currently in construction.

Etude have been involved since RIBA Stage 3 and have provided design review and a bespoke staged certification process for this complex facility. The site is adjacent to a busy artery road in London and therefore has full building cooling through the ventilation system to manage summer temperatures. The scheme changed from a district heating connection to a building heat pump solution during construction, drastically reducing carbon emissions from the start of operation.

Back to projects list